Analysis of Factors Causing Delays in Ballast Pump Repair Using the Kaiser-Meyer-Olkin and RCA Methods at KM XXX at PT XYZ

Authors

  • Febian Rizky Purnama Universitas Pembangunan Nasional "Veteran" Jawa Timur Author
  • Mega Cattleya PA Islami Universitas Pembangunan Nasional "Veteran" Jawa Timur Author

Keywords:

Ballast Pump, Delay, Kaiser-Meyer-Olkin (KMO), Root Cause Analysis (RCA), Shipyard

Abstract

The shipping sector is a crucial element in a nation's shipping operations, particularly in ensuring the optimal performance of essential components such as ballast pumps. However, the repair time for the ballast pumps on the KM XXX ship at the PT XYZ shipyard often exceeds the initial estimate (seven working days), resulting in financial losses and increased waiting time for the ship at port. This study is designed to identify the main determinants behind the delays in ballast pump repairs and formulate strategic recommendations to optimize maintenance effectiveness. The analytical methods applied include Kaiser-Meyer-Olkin (KMO) for factor analysis and Root Cause Analysis (RCA) supplemented by a Fishbone Diagram to determine the root cause of a problem. By determining the main factors and root causes, this study presents detailed and systematic improvement recommendations. These recommendations are designed to optimize the effectiveness of ballast pump maintenance and mitigate adverse consequences on ship operational performance.

References

[1] Meisi Riana, “Literature Review : Faktor – Faktor Yang Mempengaruhi Perilaku Penggunaan Alat Pelindung Diri (APD) Pada Pekerja Industri,” Jurnal Ilmiah Fakultas Teknik Universitas Quality (JUITECH), vol. 5, no. 1, 2021.

[2] Hani Hasanah, Sunaryo, Vivian Karim Ladesi, Dedi Purwana, Saparuddin, Achmad Husen, and Suparno, “Pengembangan Kompetensi Inti Melalui Teknologi Digital Dalam Industri Logistik Maritim: Tinjauan Pustaka Sistematis,” Jurnal Logistik, vol. 18, no. 02, pp. 277–290, 2025.

[3] A. M. Yusuf and D. Soediantono, “Supply Chain Management and Recommendations for Implementation in the Defense Industry : A Literature Review,” International Journal Of Social And Management Studies (IJOMAS), vol. 3, no. 3, pp. 63–77, 2022.

[4] B. F. Haryoko, M. Farhanudin, S. R. Octaviary, and M. A. Yaqin, “Survei Metode Pengembangan Jadwal Menggunakan Metode Semantic Literature Review,” Ilk. J. Comput. Sci. Appl. Informatics, vol. 4, no. 3, pp. 335–345, 2022, [Online].

[5] W. D. Putra, “Penerapan Building Information Modeling (BIM) dalam Manajemen Proyek Konstruksi (Literature Review),” Jurnal Teknik Sipil (MACCA), vol. 10, no. 1, pp. 85–90, 2025.

[6] S. T. Kau and R. A. Santoso, “Analisis Pengaruh Ukuran Perusahaan Terhadap Audit Delay Berdasarkan Literature Review Terindeks Sinta,” Gorontalo Accounting Journal, vol. 7, no. 1, 2024.

[7] D. Aulia, L. Ma, I. Yurrazak, and H. H. Purba, “Manajemen Risiko Safety dalam Proyek Konstruksi Bendungan : Kajian Literatur,” Journal of Industrial and Engineering System (JIES), vol. 2, no. 1.

[8] G. A. Antika, D. Kurnia, and S. Munawaroh, “Analisis Kritis Terkait Efektivitas Program Dinas Tenaga Kerja Kota Cimahi Pada Masa Covid-19 Tahun 2021,” Jurnal Caraka Prabu, vol. 6, no. 1, pp. 42–64, 2022.

[9] Wibowo, Eka Putri Julianti, and Rachmat Pramukty. "Pengaruh investasi, ekspor, dan tenaga kerja terhadap pertumbuhan ekonomi di Indonesia." Jurnal Akuntansi, Manajemen, Bisnis dan Teknologi 3.2 (2023): 180-190.

[10] A. D. W. I. Cahya, V. T. Prabowo, and A. Febri, “Pengaruh Kompensasi Terhadap Kepuasan Kerja Karyawan (Studi Kasus : Lancar Ponsel),” Jurnal Daya Saing, vol. 7, no. 3 2021.

[11] M. Faisal, S. Ali, W. Dinata, and D. R. Sari, “Analisis Komponen Utama pada Dinas Ketenagakerjaan Bagian Penempatan dan Perluasan Kerja Mencari Pekerjaan Menurut Golongan Pekerjaan,” Journal of Innovation Research and Knowledge, vol. 2, no. 12, pp. 4561–4568, 2023.

[12] N. P. Wahyuningtyas, D. E. Ratnawati, and N. Y. Setiawan, “Root Cause Analysis (RCA) berbasis Sentimen menggunakan Metode K- Nearest Neighbor (K-NN) (Studi Kasus : Pengunjung Kolam Renang Brawijaya),” Jurnal Pengembangan Teknologi Informasi dan Ilmu Komputer, vol. 7, no. 5, pp. 2515–2520, 2023.

[13] M. A. Sitompul, “Implementasi Metode Root Cause Analysis (RCA) untuk Mengendalikan Reject Produk NP Project di PT. XYZ,” Journal of Manufacturing in Industrial Engineering and Technology (MINE-TECH), vol. 3, no. 1, pp. 83–92, 2024, doi: 10.30651/mine-tech.v3i2.24157.

[14] Y. D. Mandasari, M. E. Widyaningrum, M. E. Widiana, "Pengaruh Disiplin Kerja, Kompetensi, dan Konflik Kerja terhadap Motivasi Kerja dan Kinerja Pegawai, “ Indonesian Journal of Management Science, pp. 39–49, 2022.

[15] E. Triandini, S. Jayanatha, A. Indrawan, G. W. Putra, and B. Iswara, “Metode Systematic Literature Review untuk Identifikasi Platform dan Metode Pengembangan Sistem Informasi di Indonesia,” Indonesian Journal of Information Systems (IJIS) vol. 1, no. 2, 2019.

[16] T. Rukhmana, “Memahami sumber data penelitian : Primer, Sekunder, dan Tersier,” Jurnal Edu Research Indonesian Institute Learning And Studies, vol. 2, no. 2, pp. 28–33, 2021.

Downloads

Published

11/01/2026

How to Cite

[1]
“Analysis of Factors Causing Delays in Ballast Pump Repair Using the Kaiser-Meyer-Olkin and RCA Methods at KM XXX at PT XYZ”, jse, vol. 11, no. 1, Jan. 2026, Accessed: May 01, 2026. [Online]. Available: https://jse.serambimekkah.id/index.php/jse/article/view/1526

Similar Articles

1-10 of 477

You may also start an advanced similarity search for this article.