Pengaruh Pre-Clearance, Customs Clearance dan Post-Clearance Terhadap Dwelling Time di PT XYZ Menggunakan Metode Regresi Linear Berganda

Authors

  • Palmarosa Ardianti Putri Hardhika Program Studi Teknik Industri, Universitas Pembangunan Nasional Veteran Jawa Timur Author
  • Joumil Aidil Saifuddin Z.S Program Studi Teknik Industri, Universitas Pembangunan Nasional Veteran Jawa Timur Author

Keywords:

custom clearance, post-clearance, pre-clearance, regresi linear berganda, waktu tunggu

Abstract

Dwelling time is the time taken to unload containers loaded with imported goods from a port until the containers leave the port. PT XYZ as a state-owned industrial company that actively carries out import activities must deal with complex challenges in managing the clearance process. Depending on the process, the dwelling time is divided into three stages, namely pre-clearance, custom clearance, and post-clearance. This study aims to determine the effect of pre-clearance, custom clearance, and post-clearance on dwelling time both simultaneously and partially and to find out which factors influence on dwelling time. The method used in this research is multiple linear regression analysis using SPSS software. The results showed that pre-clearance, custom clearance, and post-clearance factors have a significant influence on dwelling time both simultaneously and partially. The dominant factor influencing dwelling time is the post-clearance factor, with the highest coefficient value of 1.742. By making improvements at the post-clearance stage, PT XYZ can reduce the duration of dwelling time and increase its business efficiency.

References

[1] R. Lee, “The Effect of Supply Chain Management Strategy on Operational and Financial Performance,” Sustain., vol. 13, no. 9, 2021, [Online]. Available: https://doi.org/10.3390/su13095138

[2] Safira Safira, Banu Radyto Dwi Satrio, Muftiana Wildiansah, Raissa Azaria Andini, and Siti Sahara, “Analisis Pengaruh Dwelling Time Terhadap Efisiensi Bongkar Muat Di Pelabuhan Tanjung Priok,” Mimb. Adm. FISIP UNTAG Semarang, vol. 20, no. 1, pp. 71–84, 2023, doi: 10.56444/mia.v20i1.656.

[3] S. L. Anita and I. Asmadewa, “Analisis Dwelling Time Impor Pada Pelabuhan Tanjung Priok Melalui Penerapan Theory of Constraints,” J. Perspekt. Bea Dan Cukai, vol. 1, no. 1, 2017, doi: 10.31092/jpbc.v1i1.125.

[4] A. Safira, E. Buchari, and E. Kadarsah, “Pre Clearance Analysis on Dwelling Time for Imported Container (Case Study: Boom Baru Port),” Int. J. Innov. Sci. Res. Technol., vol. 5, no. 7, pp. 595–600, 2020, doi: 10.38124/ijisrt20jul352.

[5] B. P. Simamora, “Pengaruh Kualitas Pelayanan Dwelling Time Dan Billing System Terhadap Kepuasan Pelanggan ( Studi pada Jakarta International Container Terminal ),” J. Adm. Bisnis, vol. 49, no. 1, pp. 179–188, 2017.

[6] Amalia Amalia, Dedy Rusmiyanto, and Ratna Hidayati, “Analisis Faktor Demurrage, Dwelling Time Dan Human Resources Terhadap Waiting Time Pada PT. Putra Segara Abadi,” J. Penelit. Rumpun Ilmu Tek., vol. 2, no. 2, pp. 01–20, 2023, doi: 10.55606/juprit.v2i2.1458.

[7] Septianingrum, Lesti, Hartati M. Pakpahan, and Pradhana W. Nariendra. "Faktor-faktor yang Mempengaruhi Waktu Siklus Bongkar Batu Bara di Pelabuhan Karya Citra Nusantara Marunda." Warta Penelitian Perhubungan 35.2 (2023): 190-199.

[8] E. Y. Ardyka Putra, F. X. A. P. Nugroho, and R. N. Pradana Putra, “Proses Pemindahan Lokasi Penimbunan Kontainer Impor di Depo PT. Karana Panorama Logistik Surabaya,” J. Apl. Pelayaran Dan Kepelabuhanan, vol. 13, no. 2, pp. 66–75, 2023, doi: 10.30649/japk.v13i2.91.

[9] Dharmakarja, I. Gede Made Artha, and Dzulham Faruq Rifqi Wardana. "A Study Of Dwelling Time At Tanjung Perak Harbor Surabaya Indonesia." Jurnal Perspektif Bea Dan Cukai 8.1 (2024): 55-71.

[10] I. M. Ruwantono and S. N. W. P, “Analisis Penyebab Tidak Tercapainya Target Dwelling Time Menggunakan Metode Fault Tree Analysis, Studi Kasus: Pelabuhan Tanjung Priok (PELINDO II),” Ind. Eng. Online J., vol. 5, no. 4, pp. 343–354, 2016, [Online]. Available: https://ejournal3.undip.ac.id/index.php/ieoj/article/view/14048

[11] F. C. Revana and S. Y. Putri, “Bagaimana Dwelling Time Berdampak Pada Pendapatan Di Pt Terminal Petikemas Surabaya ?,” vol. 1, no. 3, pp. 109–121, 2024.

[12] Kusharyanto, C. I. Nawawi, A. M. Putra, A. K. Dewi, M. I. I. Purnama, and N. Nuha, “Pengaruh pre clearance dan post clearance terhadap dwelling time di Pelabuhan Peti Kemas JICT Tanjung Priok,” J. Mar. Insid., vol. 5, no. 1, pp. 15–18, 2023, doi: https://doi.org/10.62391/ejmi.v5i1.57.

[13] R. Listiawati, T. M. R. Fauzan, and Ansori, “Analisis Faktor-Faktor Yang Mempengaruhi Dwelling Time Peti Kemas Di Pelabuhan Tanjung Priok,” Account, vol. 9, no. 1, pp. 1648–1655, 2022, doi: 10.32722/acc.v9i1.4588.

[14] N. A. Ningsih, S. Rangkuti, and M. Zulkarnain, “Pengaruh Kelengkapan Administrasi Dan Kategori Importir Terhadap Dwelling Time Pada Pt. Anugerah Indo Maritim Sejahtera Medan Belawan,” J. Econ. Manag. Bus., vol. 1, no. 1, pp. 55–68, 2022, doi: 10.46576/.v1i1.2138.

[15] A. Djamaluddin, C. Paotonan, and M. T. Dewi, “Analisis Pengaruh Produktivitas Bongkar Muat Terhadpa Dwelling Time Di Terminal Petikemas New Makassar,” Movere J., vol. 5, no. 2, pp. 178–184, 2023, [Online]. Available: http://ojs.stie-tdn.ac.id/index.php/mv

[16] F. D. Nurhabiba, Misdalina, and Tanzimah, “Kemampuan Higher Order Thinking Skill (HOTS) Dalam Pembelajaran Berdiferensiasi SD 19 Palembang,” J. Ilm. PGSD FKIP Univ. Mandiri, vol. 09, no. 03, pp. 492–504, 2023.

Downloads

Published

06/01/2025

How to Cite

[1]
“Pengaruh Pre-Clearance, Customs Clearance dan Post-Clearance Terhadap Dwelling Time di PT XYZ Menggunakan Metode Regresi Linear Berganda”, jse, vol. 10, no. 1, Jan. 2025, Accessed: Jan. 09, 2025. [Online]. Available: https://jse.serambimekkah.id/index.php/jse/article/view/665

Similar Articles

1-10 of 53

You may also start an advanced similarity search for this article.