Analisis Penyebab Terjadinya Overcapacity Pada Gudang Menggunakan Metode Root Cause Analysis (RCA) di PT. XYZ

Authors

  • Bayu Dedi Saputra Budianto Jurusan Teknik Industri, Universitas Pembangunan Nasional “Veteran” Jawa Timur Author
  • Akmal Suryadi Jurusan Teknik Industri, Universitas Pembangunan Nasional “Veteran” Jawa Timur Author

Keywords:

fishbone diagram, overcapacity, root cause analysis, warehouse, 5-why analysis

Abstract

PT. XYZ is a manufacturing company that assembles bicycles. The company's problem is that there is excess capacity in the warehouse owned by PT. XYZ. Overcapacity occurs when the number of incoming goods exceeds the optimal capacity of the warehouse. The purpose of this study is to identify the cause of overcapacity in the warehouse of PT. XYZ's warehouse and to find a solution to the problem in order to prevent similar incidents in the future. The method used is root cause analysis and the tools used are fishbone diagram and 5-why analysis. The results of the study using the fishbone diagram show that there are four aspects that are the root causes, namely errors in purchasing planning (man), excessive use of pallets (method), accumulation of bicycle spare parts (material), use of warehouse capacity that is not optimal (environment). Each of these aspects has a known trigger root after applying the 5-why analysis. Once the triggers of each problem are known, the preparation of corrective actions, which are solutions, is accompanied by the company's commitment to implement the solution in order to prevent problems that have the potential to recur.

References

[1] B. A. Herlambang, E. Santoso, and A. Arwan, “Sistem Pengelolaan Inventory Gudang (Studi Kasus : PT . Papua Utama Mitra),” J. Pengemb. Teknol. Inf. dan Ilmu Komput., vol. 5, no. 10, pp. 4319–4327, 2021.

[2] A. I. Samuel, A. B. H. Jan, and I. D. Palandeng, “Analisis Penerapan Manajemen Pergudangan Pada Gudang Pt Trakindo Utama Manado,” J. EMBA J. Ris. Ekon. Manajemen, Bisnis dan Akunt., vol. 11, no. 4, pp. 677–685, 2023, doi: 10.35794/emba.v11i4.51036.

[3] L. G. Gunawan and H. C. Palit, “Pengurangan Lead time Picking dan Put away dengan Perancangan Tata Letak Material pada BLP PT. Schneider Electric,” J. Titra, vol. 8, no. 1, pp. 103–108, 2020.

[4] F. A. Barata, Supply Chain Management Sebagai Strategi Dan Solusi, vol. 11, no. 1. Yogyakarta: RELASI INTI MEDIA, 2022.

[5] D. Kurniasih, Y. Rusfiana, A. Subagyo, and R. Nuradhawati, Teknik Analisa, 1st ed. Bandung: ALFABETA, 2021.

[6] A. Mustofa, C. Rudianto, and P. F. Tanaem, “Perancangan Sistem Informasi Perpustakaan SMA N 1 Tengaran Menggunakan Root Cause Analysis (RCA),” JATISI (Jurnal Tek. Inform. dan Sist. Informasi), vol. 9, no. 1, pp. 137–149, 2022, doi: 10.35957/jatisi.v9i1.1470.

[7] B. M. R. K. Fallah, F. F. Zulfadhli, I. Abidah, M. H. A. Hadian, and Z. Saputra, “Implementasi Root Cause Analysis Dalam Mengidentifikasi Faktor-Faktor Peningkatan Superhost Pada Data Airbnb Host Listing,” vol. 2, no. 7, pp. 1–14, 2024, doi: 10.62281.

[8] A. N. Rouf and K. Muhammad, “Analisis Perbaikan Penulisan List of Material Program Preservasi Menggunakan Metode Root Cause Analysis (RCA),” vol. 4, no. 4, pp. 452–459, 2023.

[9] N. Susendi, A. Suparman, and I. Sopyan, “Kajian Metode Root Cause Analysis yang Digunakan dalam Manajemen Risiko di Industri Farmasi,” Maj. Farmasetika, vol. 6, no. 4, p. 310, 2021, doi: 10.24198/mfarmasetika.v6i4.35053.

[10] I. P. Widnyana, I. W. Ardiana, E. Wolok, and T. Lasalewo, “Penerapan Diagram Fishbone dan Metode Kaizen untuk Menganalisa Gangguan pada Pelanggan PT PLN (Persero) UP3 Gorontalo,” Jambura Ind. Rev., vol. 2, no. 1, pp. 1–9, 2022, doi: 10.37905/jirev.2.1.11-19.

[11] E. Aristriyana and R. Ahmad Fauzi, “Analisis Penyebab Kecacatan Produk Dengan Metode Fishbone Diagram Dan Failure Mode Effect Analysis (Fmea) Pada Perusahaan Elang Mas Sindang Kasih Ciamis,” J. Ind. Galuh, vol. 4, no. 2, pp. 75–85, 2023, doi: 10.25157/jig.v4i2.3021.

[12] S. W. Wijaya, “Analisis Kendala Pada Proses Penerimaan Piutang dari Customers dengan Metode Fishbone,” J. Ilm. Multidisipline, vol. 2, no. 2, pp. 8–12, 2023.

[13] R. Fitriana, D. K. Sari, and A. N. Habyda, Pengendalian dan Penjaminan Mutu. Banyumas: Wawasan Ilmu, 2021.

[14] Suharto, N. Ningsih, and K. Ali, “Pengendalian Kerusakan Produk Pada Industri Rumahan Mitra Keluarga Kabupaten Lampung Timur,” Deriv. J. Manaj., vol. 16, no. 2, pp. 351–361, 2022.

[15] S. Santoso, Sarnadi, and I. Apriasty, “Penerapan Metode Fishbone Diagram and 5 Wyh’S Analysis Untuk Meningkatkan Kualitas Produk Pakaian Jadi,” VISIONIDA J. Manaj. dan Bisnis, vol. 8, no. 2, pp. 27–41, 2022.

[16] Fedrico, A. S. Tampubolon, J. B. Lordian, N. Pratamasari, and R. P. Siahaan, “Pengurangan Jumlah Kecacatan Crumb Rubber Produksi PT XYZ dengan Metode Failure Mode and Effect Analysis (FMEA),” Talent. Conf. Ser. Energy Eng., vol. 7, no. 1, pp. 1219–1223, 2024, doi: 10.32734/ee.v7i1.2337.

[17] E. Wirawan and Minto, “Penerapan Metode PDCA dan 5 Why Analysis pada WTP Section di PT Kebun Tebu Mas,” J. Penelit. Bid. Inov. Pengelolaan Ind., vol. 1, no. 01, pp. 1–10, 2021, doi: 10.33752/invantri.v1i01.1825.

[18] A. A. Sibarani, V. M. A. Fatah, and D. T. Setyaningrum, “Analisis Quality Control Pada Proses Sewing Dengan Statistical Process Control (SPC) dan 5-Why’s Analysis,” J. Res. Ind. Eng. Manag., vol. 1, no. 1, pp. 11–19, 2023, doi: 10.61221/jriem.v1i1.4.

[19] Irhamni and T. M. A. Pandria, “Analisis Penyebab Low Level Raw Water Menggunakan 5 – Why Analysis dan Fishbone di WTP PT. PLN UPK Nagan Raya,” J. Serambi Eng., vol. 7, no. 3, pp. 3414–3420, 2022, doi: 10.32672/jse.v7i3.4413.

[20] A. G. Prawiyogi, T. L. Sadiah, A. Purwanugraha, and P. N. Elisa, “Penggunaan Media Big Book untuk Menumbuhkan Minat Membaca di Sekolah Dasar,” J. Basicedu, vol. 5, no. 1, pp. 446–452, 2021, doi: 10.31004/basicedu.v5i1.787.

[21] E. Trivaika and M. A. Senubekti, “Perancangan Aplikasi Pengelola Keuangan Pribadi Berbasis Android,” Nuansa Inform., vol. 16, no. 1, pp. 33–40, 2022, doi: 10.25134/nuansa.v16i1.4670.

Downloads

Published

13/03/2025

Issue

Section

Articles

How to Cite

[1]
“Analisis Penyebab Terjadinya Overcapacity Pada Gudang Menggunakan Metode Root Cause Analysis (RCA) di PT. XYZ”, jse, vol. 10, no. 2, Mar. 2025, Accessed: Mar. 14, 2025. [Online]. Available: https://jse.serambimekkah.id/index.php/jse/article/view/852

Similar Articles

21-30 of 237

You may also start an advanced similarity search for this article.