Hubungan Antara Lama Jam Kerja dan Tingkat Kelelahan Pekerja di Galangan Kapal PT X Berdasarkan Pemeriksaan Kesehatan

Authors

  • Ade Tria Mareta Universitas Pembangunan Nasional “Veteran” Jawa Timur Author
  • Muhammad Faisal Fadhil Universitas Pembangunan Nasional “Veteran” Jawa Timur Author

Keywords:

work fatigue, working hours, shipyard workers

Abstract

Work in shipyards is characterized by high workload, intense physical activity, and extreme environmental conditions. These conditions have the potential to cause fatigue, which may negatively impact performance, health, and occupational safety. This study aims to analyze the relationship between working hours and the level of fatigue among shipyard workers at PT X in Surabaya. The research was conducted from June 10 to 18, 2025, involving 37 active workers as the population, with samples selected using simple random sampling. Data were collected through interviews, field observations, and health examinations, then analyzed using Pearson correlation test with Minitab 18 software. Fatigue was measured based on six indicators: physical exhaustion, decreased concentration, mood instability, persistent drowsiness, lack of enthusiasm, and forgetfulness. The analysis showed a very weak correlation between working hours and physical fatigue (r = -0.004; p = 0.982), and a similarly weak correlation with concentration (r = -0.268; p = 0.108). However, the lack of enthusiasm variable showed a significant correlation in the 12-hour work group (r = 0.348; p = 0.035). This indicates that work motivation is more sensitive to long working hours than physical complaints. The conclusion of this study highlights that extended working hours can reduce motivation and potentially trigger chronic fatigue.

References

[1] M. Yusuf, M. F. Idris, and M. B. Nur, “Manajemen Risiko Keselamatan Dan Kesehatan Kerja Pada Pekerjaan Galangan Kapal Di Tanjungpinang,” J. Kesehat., vol. 12, no. 2, pp. 102–114, 2024, doi: 10.32763/bezg2z67.

[2] Muhammad Alfiansyah Miftachul Ridho; Sri Wahyuni; Nur Falah Setyawati, “Analisis Beban Kerja Terhadap Kelelahan Fisik Pada Tenaga Kerja PT Galangan Kalimas Kota Balikpapan,” J. Keselamatan, Kesehat. Kerja dan Lindungan Lingkung., vol. 10, no. 1, pp. 129–135, 2024.

[3] S. Rokhati, N. Widajati, E. Dwiyanti, S. M. Elias, A. A. Efendi, and A. N. Ardhani, “Factors That Cause Work Fatigue Among Shipyard Workers,” Folia Medica Indones., vol. 59, no. 3, pp. 229–237, 2022.

[4] D. Okumus et al., “The impact of fatigue on shipyard welding workers’ occupational health and safety and performance,” Ocean Eng., vol. 285, no. P1, p. 115296, 2023, doi: 10.1016/j.oceaneng.2023.115296.

[5] Darim, J. M. Isi, P. B. C. Siahaan, L. E. N. N, and R. Rimonda, “Hubungan Waktu dan Masa Kerja dengan Kelelahan Kerja Pada Karyawan Pabrik Di PT. Z,” J. Ilmu Kedokt. dan Kesehat., vol. 11, no. 9, pp. 1754–1762, 2024.

[6] Marsytha Febriyanti Achmar, Syawal K. Saptaputra, and Irma Yunawati, “Hubungan Beban Kerja dan Kelelahan Kerja Dengan Stres Kerja Pada Pekerja di PT X,” J. Multidisiplin Madani, vol. 2, no. 9, pp. 3589–3595, 2022, doi: 10.55927/mudima.v2i9.1216.

[7] F. Fatmawati, B. Aswin, and M. Syukri, “Faktor yang Berhubungan dengan Tingkat Kelelahan Kerja Pada Pekerja Bagian Produksi di PT. XYZ,” J. Kesehat. Glob., vol. 6, no. 2, pp. 72–80, 2023, doi: 10.33085/jkg.v6i2.5714.

[8] E. D. Safira, R. M. Pulungan, and C. Arbitera, “Kelelahan Kerja pada Pekerja di PT. Indonesia Power Unit Pembangkitan dan Jasa Pembangkitan (UPJP) Priok,” J. Kesehat., vol. 11, no. 2, pp. 265–271, 2020, doi: 10.26630/jk.v11i2.2134.

[9] Handa Putra Wicaksono, Daru Lestantyo, and Yuliani Setyaningsih, “Kelelahan yang Terjadi pada Pekerja Konstruksi,” Media Publ. Promosi Kesehat. Indones., vol. 7, no. 5, pp. 1254–1258, 2024, doi: 10.56338/mppki.v7i5.5143.

[10] A. S. Moreira and S. R. de Lucca, “Physical and mental fatigue in shift work and mitigation strategies: an integrative review,” Rev. Bras. Med. do Trab., vol. 22, no. 4, pp. 1–11, 2024, doi: 10.47626/1679-4435-2024-1267.

[11] I. A. I. D. Muhammad Rangga Danu Putra, Muhammad Sultan and D. N. H. Lestari, Iwan M Ramdan, “Hubungan Beban Kerja, Durasi Kerja dan Shift Kerja Dengan Kelelahan Kerja Pada Pekerja Produksi PT X Samarinda,” HSEJ Heal. Saf. Environ. J., vol. 4, no. 1, pp. 50–55, 2025.

[12] Oc, Sri Rahayu Fitrah, Arum Dian Pratiwi, and Rastika Dwiyanti Liaran. "Hubungan Beban Kerja, Status Gizi, Shift Kerja, Kualitas Tidur, Keluhan MSDs Dengan Kelelahan Kerja Pada Karyawan PT. X tahun 2023." Jurnal Kesehatan dan Keselamatan Kerja Universitas Halu Oleo 5.4 (2025).

[13] C. I. Cahyani and M. Sahri, “Analisis Faktor Yang Berhubungan dengan Kelelahan Kerja Subjektif pada Pekerja di PT. X,” J. Bahana Kesehat. Masy., vol. 8, no. 1, pp. 35–43, 2024.

[14] X. Ma, A. Kawakami, and T. Inui, “Impact of Long Working Hours on Mental Health Status in Japan: Evidence from a National Representative Survey,” Int. J. Environ. Res. Public Health, vol. 21, no. 7, 2024, doi: 10.3390/ijerph21070842.

[15] R. Kim, “Predictors of Satisfaction With Work Environment in the Context of a Mismatch in Working Hours: A Nationwide, Large-Scale, Cross-Sectional Study,” Inq. (United States), vol. 59, no. 1, pp. 1–11, 2022, doi: 10.1177/00469580221128239.

[16] K. D. Ramadani, “Hubungan Jam Kerja Dan Kesehatan Pekerja Di Indonesia,” J. Kesmas (Kesehatan Masyarakat) Khatulistiwa, vol. 8, no. 1, p. 33, 2021, doi: 10.29406/jkmk.v8i1.2638.

[17] H. Pujiati and A. Dwitiyono, “The Influence of Workload, Job Stress And Work Fatigue On The Performance of PT Ramai Abadi Employees In Jakarta,” Humanit. Manag. Sci. Proc., vol. 4, no. 1, pp. 1726–1736, 2023.

[18] M. A. Habibie Alfahmi and A. Zuhairsyah Faris, “Hubungan Usia, Masa Kerja, Status Gizi Dan Beban Kerja Terhadap % Cardiovascular Load (% Cvl) Pada Pekerja Area Fill and Pack, Cosmetic Production Di PT X,” Heal. Tadulako J. (Jurnal Kesehat. Tadulako), vol. 9, no. 2, pp. 167–175, 2023, doi: 10.22487/htj.v9i2.668.

[19] M. Miftahuddin, A. Pratama, and I. Setiawan, “Hubungan Antara Kelembaban Relatif Dengan Beberapa Variabel Iklim Dengan Pendekatan Korelasi Pearson di Samudera Hindia,” J. Siger Mat., vol. 2, no. 1, pp. 25–33, 2021, doi: 10.23960/jsm.v2i1.2753.

[20] M. Handayani and C. Demiyati, “Hubungan Faktor Individu Dan Faktor Pekerjaan Dengan Keluhan,” J. Kesehat. Masy., vol. 11, no. 11, pp. 352–357, 2022, [Online]. Available: http://eprints.ulm.ac.id/8044/1/21.

[21] E. Oktariani, A. Julkandri, and Y. Pratiwi, “Hubungan stres kerja dengan kelelahan kerja pada pekerja di pabrik kelapa sawit tahun 2020,” Collab. Med. J., vol. 5, no. 3, pp. 16–21, 2022, doi: 10.36341/cmj.v5i3.3279.

Downloads

Published

09/07/2025

Issue

Section

Articles

How to Cite

[1]
“Hubungan Antara Lama Jam Kerja dan Tingkat Kelelahan Pekerja di Galangan Kapal PT X Berdasarkan Pemeriksaan Kesehatan”, jse, vol. 10, no. 3, Jul. 2025, Accessed: Jan. 28, 2026. [Online]. Available: https://jse.serambimekkah.id/index.php/jse/article/view/1035

Similar Articles

131-140 of 170

You may also start an advanced similarity search for this article.