Analisis Perbaikan Sistem Kerja dengan Penerapan Metode 5R di Bengkel Bina Motor Service Jakarta Utara

Authors

  • Indra Rizki Pratama Program Studi Teknik Industri Otomotif, Politeknik STMI Jakarta, Jakarta Pusat Author
  • Arif Dzulfikar Program Studi Administrasi Bisnis Otomotif, Politeknik STMI Jakarta, Jakarta Pusat Author
  • Busharmaidi Program Studi Administrasi Bisnis Otomotif, Politeknik STMI Jakarta, Jakarta Pusat Author
  • Fredy Sumasto Program Studi Teknik Industri Otomotif, Politeknik STMI Jakarta, Jakarta Pusat Author
  • Isma Wulansari Program Studi Teknik Kimia Polimer, Politeknik STMI Jakarta, Jakarta Pusat Author

Keywords:

competition,, workshop, work system, 5R, efficient

Abstract

The existence of quite tight competition in the automotive sector, especially workshops, makes customers more careful in choosing a quality workshop. The work system of the Bina Motor Services and Spare Parts workshop is classified as inefficient, because customers still wait quite a long time when carrying out motorbike services. Therefore, the aim of this research is to apply the 5Rs to create a more efficient and productive work system. The research method used is qualitative through observation and interviews to determine deficiencies in each stage of the 5S and the solutions. Implementation of 5R in the Bina Motor Services and Spare Parts workshop starts from the first stage, seiri, cleaning and disposing of unused items so that the work space becomes wider. The second stage, seiton, at this stage the activities carried out are grouping workshop equipment so that equipment is picked up more quickly by a mechanic. In the third stage, seiso, routine cleaning of workshop equipment from dust, dirt and oil is carried out. The fourth stage, seiketsu, there is a checklist so that the implementation of 5R is carried out continuously. In the final stage, shitsuke, there is a 5R poster put up to remind all Bina Motor Services and Spareparts workshop employees to always implement 5R in the workshop.

Downloads

Published

16/04/2024

Issue

Section

Articles

How to Cite

[1]
“Analisis Perbaikan Sistem Kerja dengan Penerapan Metode 5R di Bengkel Bina Motor Service Jakarta Utara”, jse, vol. 9, no. 2, pp. 8566–8574, Apr. 2024, Accessed: Nov. 24, 2024. [Online]. Available: https://jse.serambimekkah.id/index.php/jse/article/view/132

Most read articles by the same author(s)

Similar Articles

1-10 of 136

You may also start an advanced similarity search for this article.