Optimalisasi Unit Proses Pengolahan Air Minum Pada Perusahaan Umum Daerah

Authors

  • M Alif Rifky Program Studi Teknik Lingkungan, Universitas Singaperbangsa Karawang Author
  • Wilma Nurrul Adzillah Program Studi Teknik Lingkungan, Universitas Singaperbangsa Karawang Author
  • Okti Dinasakti Nurul Mentari Program Studi Teknik Lingkungan, Universitas Singaperbangsa Karawang Author

Abstract

The International Research Centre (IRC) is one of the units in the IPA Poncol branch, which includes coagulation, flocculation, sedimentation, filtration and disinfection units with a capacity of 40 L/sec concrete building. Based on direct observation, the problem in the IRC unit is that the produced effluent is less than optimal, which is 29.4 l/sec, while the designed capacity of the IRC unit is 40 l/sec and does not match the existing process units in the IRC with the applicable design criteria. The cause of the sub-optimal discharge is due to a malfunctioning penstock in the flocculation unit, filter media that has not been replaced for a long time and some valves that have not been maintained. The design criteria that are not met by the IRC unit are the velocity gradient parameter multiplied by the retention time in the coagulation unit, the retention time in the flocculation and sedimentation unit and the backwash time in the filtration unit. The purpose of this study is to provide recommendations for the optimisation of the IRC process unit at Poncol Branch IPA. The method used is to analyse the existing conditions with applicable design criteria. The results of this study are to provide recommendations for the coagulation unit, namely the height of the inlet well to the coagulation basin, changes in the water level in compartment one of the flocculation unit, and changes in the volume of the sedimentation and filtration units.

References

[1] Sipil, P. T. (2008). SNI 6774:2008 Tata Cara Perencanaan Unit Paket Instalasi Pengolahan Air.

[2] Pusat, P. (2021). Peraturan Pemerintah No 22 Tahun 2021 Tentang Penyelenggaraan Perlindungan dan Pengelolaan Lingkungan Hidup.

[3] Pusat, P. (2023). Peraturan Menteri Kesehatan Republik Indonesia Nomor 2 Tahun 2023 .

[4] Andrean, M. (2015). Evaluasi Instalasi Pengolahan Air Minum (Ipa) Tangan-Tangan Pdam Gunong Kila Kabupaten Aceh Barat Daya. Tugas Akhir, 40-50.

[5] Aldio Dhiva Pratama, E. H. (2021). Penentuan Desain Optimum Penstock untuk Pembangkit Listrik Tenaga Mikrohidro di Sungai Poreng, Jember. Jurnal Teknik Pengairan, 2-10.

[6] Indaryanto, E. A. (2017). Perancangan Unit Instalasi Pengolahan Air Minum Kampus Institut Teknologi Sepuluh Nopember. Jurnal Teknik ITS Vol. 6, No. 1,, 1-3.

[7] Kembara, T. R. (2018). Optimalisasi Instasalasi Pengolahan Air (Ipa) Pram Tirta Daroy Kota Banda Aceh Terhadap Tingkat Kekeruhan Air Saat Musim Penghujan. Universitas Islam Negeri Ar-Raniry, 90.

[8] Mar’atus Sholikhah, R. D. (2023). Evaluasi Unit Koagulasi, Flokulasi, Sedimentasi, dan Filtrasi pada Instalasi Pengolahan Air (IPA) Semanggi Perumda Air Minum Toya Wening Kota Surakarta. Seminar Nasional Sains dan Teknologi Terapan, 2-9.

[9] Muhammad Rafly Ananto, R. H. (2023). Perencanaan Instalasi Pengolahan Air Minum Di Kecamatan Pondok Gede, Kota Bekasi. Jurnal Lingkungan dan Sumberdaya Alam (Jurnalis), 7-10.

[10] Purnomo, A. C. (2013). Kajian Kinerja Teknis Proses dan Operasi Unit Koagulasi-Flokulasi-Sedimentasi pada Instalasi Pengolahan Air (IPA) Kedunguling PDAM Sidoarjo. Jurnal Teknik Pomits, 1-6. (Mar'atus Sholikhah, 2023)

[11] Mar’atus Sholikhah, R. D. (2023). Evaluasi Unit Koagulasi, Flokulasi, Sedimentasi, dan Filtrasi pada Instalasi Pengolahan Air (IPA) Semanggi Perumda Air Minum Toya Wening Kota Surakarta. Seminar Nasional Sains dan Teknologi Terapan, 2-9.

[12] Andinda. (2016). Perencanaan Pengembangan Instalasi Pengolahan Air Minum Di Kawasan Bumi Serpong Damai, Tangerang Selatan. Perpustakaan Universitas Trisakti, 15-40.

[13] Andre Velthuzed, A. D. (2015). Redesain Sistem Penyediaan Air Minum (SPAM) Pedesaan Di Desa Wiyono, Kabupaten Pesawaran. Politeknik Negeri Lampung, 15.

[14] Harissa. (2018). Evaluasi dan Optimalisasi Sistem Pengolahan Air Minum Pada Instalasi Pengolahan Air (IPA) Jaluko Kapasitas 50 L/S Kabupaten Muaro Jambi. Universitas Jambi, 110.

[15] Saria, Y. S. (2022). Studi Aliran Air dalam Pipa Penstock pada Sistem Mikrohidro dengan Pendekatan Computational Fluid Dynamics. Prisma Fisika, 1-11.