Car Body Assembly Process in Assemblyng Section at Suzuki Indomobil Motor Plant Cikarang Company
Keywords:
assembly, assembling, automotive, car productionAbstract
This practical work was carried out at PT Suzuki Indomobil Motor Plant Cikarang with a focus on the car body assembly process in the assembling section. The assembling process is an important stage in vehicle manufacturing, where components of various sizes (small, medium, and large parts) are systematically assembled to form a complete car structure. Assembly is carried out sequentially from one station to another using a conveyor system, and involves various techniques and standard operating procedures to ensure the quality of the final result. Through this activity, students can directly understand the working system of the automotive industry, assembly methods, and gain experience in a professional work environment.
References
[1] N. Habibi Ahmad and P. Pusporini, “Lean Manufacturing (Studi Kasus PT. Sumber Urip Sejati),” 2021.
[2] L. Citra Ramadhanti, I. Bagus Sumantri, and A. Koswara, “Integrasi Digital Lean Automation dengan IoT untuk Efisiensi Proses Assembly di Industri Otomotif,” Journal of Engineering Environtmental Energy and Science, vol. 1, no. 1, pp. 15–28, 2022, [Online]. Available: http://ejurnal.ubharajaya.ac.id/index.php/JOE3S15
[3] J. Sistem, T. Industri, S. Dudin, R. Ginting, and A. Ishak, “Applying Computer Integrated Manufacturing for Productivity Improvement: A Literature Review,” Jurnal SIstem Teknik Industri (JSTI), vol. 23, no. 2, pp. 204–222, 2021, doi: 10.32734/jsti.v23i2.6279.
[4] I. Daniyan, K. Mpofu, B. Ramatsetse, E. Zeferino, G. Monzambe, and E. Sekano, “Design and simulation of a flexible manufacturing system for manufacturing operations of railcar subassemblies,” in Procedia Manufacturing, Elsevier B.V., 2020, pp. 112–117. doi: 10.1016/j.promfg.2021.07.018.
[5] F. Achmadi, B. Harsanto, and A. Yunani, “Analisis cycle time proses perakitan senjata di PT Pindad (Persero) (Cycle time analysis of weapon assembly process in PT Pindad (Persero)),” 2021.
[6] H. Hardi Purba, C. Jaqin, S. Aisyah, and dan Mutiara Nabilla, “Implementation In Automotive Industry: Literature Review And Bibliometric Study,” LARG, 2023.
[7] R. F. Akmal Mukhtariz, “Optimalisasi Proses Dengan Metode Commonize Booth B Untuk Material X** Two Tone Kansai Paint di Line Topcoat Assembly Plant,” 2024, [Online]. Available: www.polytechnic.astra.ac.id
[8] M. Fitri, M. I. Adelino, and M. L. Apuri, “Analisis Line Balancing Untuk Meningkatkan Efisiensi Lintasan Produksi Perakitan,” Rang Teknik Journal, vol. 5, no. 2, pp. 295–300, Jun. 2022, doi: 10.31869/rtj.v5i2.3223.
[9] D. Mendes, P. D. Gaspar, F. Charrua-Santos, and H. Navas, “Integrating TPM and Industry 4.0 to Increase the Availability of Industrial Assets: A Case Study on a Conveyor Belt,” Processes, vol. 11, no. 7, Jul. 2023, doi: 10.3390/pr11071956.
[10] M. Waruwu, “Metode Penelitian dan Pengembangan (R&D): Konsep, Jenis, Tahapan dan Kelebihan,” Jurnal Ilmiah Profesi Pendidikan, vol. 9, no. 2, pp. 1220–1230, May 2024, doi: 10.29303/jipp.v9i2.2141.
[11] Okpatrioka, Okpatrioka. "Research And Development (R&D) Penelitian Yang Inovatif Dalam Pendidikan. Dharma Acariya Nusantara: Jurnal Pendidikan, Bahasa Dan Budaya, 1 (1), 86–100." 2023,
[12] M. Bortolini, M. Faccio, M. Gamberi, and F. Pilati, “Motion Analysis System (MAS) for production and ergonomics assessment in the manufacturing processes,” Comput Ind Eng, vol. 139, Jan. 2020, doi: 10.1016/j.cie.2018.10.046.
[13] M. Widyantoro, R. Ilahy Rosihan, and I. Fajar, “Peningkatan Efisiensi pada Lini Proses Machining Velg Motor dengan Metode Line Balancing PT. XYZ,” vol. XIV, no. 1, pp. 54–64, 2020.
[14] K. Abdullah, R. F. Ramdhani, R. B. Ulum, and H. S. Yuda, “Analisis Line Balancing Menggunakan Metode Ranked Position Weight Pada Perakitan Body Mobil Listrik Air,” vol. 2024, no. 1, pp. 91–98, 2024, doi: 10.51132/teknologika.v14i1.
[15] Ponda, Henri, Nur Fadilah Fatma, and Itok Siswantoro. "Usulan Penerapan Lean Manufacturing Dengan Metode Value Stream Mapping (VSM) Dalam Meminimalkan Waste Pada Proses Produksi Ban Motor Pada Industri Pembuat Ban." Jurnal Heuristic 19.1 (2022): 23-42.
[16] A. C. Alves, “Lean Thinking: An Essential Mindset,” IEEE Engineering Management Review, vol. 50, no. 4, pp. 127–133, 2022, doi: 10.1109/EMR.2022.3215062.
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Sanjaya Prakoso, Ratna Dewi Anjani, Aa Santosa (Author)

This work is licensed under a Creative Commons Attribution 4.0 International License.











