Evaluasi Penanganan Limbah Material Konstruksi Pada Pembangunan Gedung Layanan Akademik Fakultas Hukum Universitas Tanjungpura Berdasarkan Greenship New Building 1.2
Keywords:
Bangunan Hijau, Proyek konstruksi repetitif, manajemen limbahAbstract
The implementation of construction projects produces waste from the construction process that has an impact on the environment. The stages of procurement and management of construction materials also contribute to the project's environmental footprint. This study evaluates the handling of construction material waste to determine the level of achievement of the application of the Source and Material Cycle category in Greenship New Building 1.2 in the Construction of the Academic Services Building of the Faculty of Law, Tanjungpura University. This research using qualitative descriptive methods through observation and interviews, the results show that the project only meets 3 of 6 categories, with 6 out of 14 points. The categories that are met include the use of regional materials, the use of refrigerants without ODP, and certified wood. Therefore, it is concluded that the building's achievement in handling material waste with the source and material cycle categories is not optimally fulfilled. Waste handling is carried out by burning, selling, reusing, storing, and returning to the building store.
References
[1] Restuningrat, Fahrul Yogi. "Limbah Konstruksi dan Dampak Sosial pada Proyek Pembangunan Gedung." Triputra: Sosial, Ekonomi dan Hukum 1.01 (2023): 20-23.
[2] Y. Zalaya, P. Handayani, and I. W. Lestari, “Pengelolaan Limbah Hasil Konstruksi Pada Proyek Pembangunan Gedung,” Forum Ilm., vol. 16, no. 1, pp. 63–73, 2019.
[3] B. A. G. Bossink and H. J. H. Brouwers, “Construction Waste: Quantification and Source Evaluation,” J. Constr. Eng. Manag., vol. 122, no. 1, pp. 55–60, 1996, doi: 10.1061/(asce)0733-9364(1996)122:1(55).
[4] Utama, Putu Ananda Raga, et al. "Analisis Pemahaman Konsep Green Construction Pada Pembangunan Gedung Konstruksi." Jurnal Ganec Swara Vol 17.1 (2023).
[5] Kementrian Lingkungan Hidup, “Peraturan Mentri RI nomor 8 tahun 2010 tentang Kriteria dan Sertifikasi Bangunan Ramah Lingkungan,” Kementrian Lingkung. HIdup, pp. 1–9, 2010.
[6] A. Pramesti, “Identifikasi Komposisi Limbah Konstruksi Pembangunan Struktur Bangunan Bertingkat Tinggi (Studi Kasus: Proyek Pembangunan Gedung DPRD dan Balaikota DKI Jakarta dan Proyek Pembangunan Tower Tiffany Kemang Village),” Perpust. Univ. Indones., pp. 1–8, 2011.
[7] F. Firmawan, “Karakteristik dan Komposisi Limbah (,” Karakteristik dan Komposisi Limbah (Construction Waste) pada Pembang. Proy. Konstr., vol. 18, p. 10, 2007.
[8] UU/18/2008, “UU No.18 Tahun 2008 tentang Pengelolaan Sampah,” Cell, vol. 151, no. 4, pp. 1–46, 2008, [Online]. Available: http://dx.doi.org/10.1016/j.biochi.2015.03.025%0Ahttp://dx.doi.org/10.1038/nature10402%0Ahttp://dx.doi.org/10.1038/nature21059%0Ahttp://journal.stainkudus.ac.id/index.php/equilibrium/article/view/1268/1127%0Ahttp://dx.doi.org/10.1038/nrmicro2577%0Ahttp://
[9] S. P. Alexandra and W. Susilowati, “Analisis Penanganan Waste Material Dengan Pendekatan Green Construction Pada Tahap Konstruksi,” J. Ilm. Rekayasa Sipil, vol. 19, no. 2, pp. 157–167, 2022, doi: 10.30630/jirs.v19i2.838.
[10] PP No. 45 Tahun, “Presiden Republik Indonesia Peraturan Presiden Republik Indonesia,” Demogr. Res., pp. 4–7, 2004.
[11] T. E. Glavinich, Contractor’s Guide to Green Building Construction: Management, Project Delivery, Documentation, and Risk Reduction. 2008. doi: 10.1002/9780470259979.
[12] A. P. Sulistiawan, “Penilaian Greenship GBCI Dalam Penerapan Reuse Material Di Café Day N Nite Bandung,” J. Arsit. TERRACOTTA, vol. 2, no. 1, pp. 44–54, 2020, doi: 10.26760/terracotta.v2i1.4342.
[13] Kementerian PUPR, “Permen Menteri Pekerjaan Umum dan Perumahan Rakyat Republik Indonesia Nomor 21 Tahun 2021,” Menteri Pekerj. Umum dan Perumah. Rakyat Republik Indones., vol. 21, pp. 95–140, 2021.
[14] Green Building Council Indonesia, “Greenship Bangunan Baru 1.2 Greenship New Building 1.2 Rating Development Gbc Indonesia,” no. Id, 2024.
[15] M. H. Kemal, T. W. Sari, D. Nurwidyaningrum, and A. B. Broto, “Kajian Penilaian Sumber dan Siklus Material Gedung Sekolah Dasar X di Jakarta Selatan , Indonesia,” vol. 12, no. 1, pp. 35–42, 2025, doi: 10.21063/JTS.2025.V1201.035-042.
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Endah Nindya Dirtami, Lusiana, Rafie (Author)

This work is licensed under a Creative Commons Attribution 4.0 International License.











