Optimasi Gerakan Operator Dengan Time and Motion Study untuk Efisiensi Produksi
Keywords:
time & motion study, Therblig, efisiensi, produktifitas, biaya produksiAbstract
The garment industry, as a labor-intensive sector, faces challenges related to efficiency and production cost due to the large number of operator movements that do not add value. As a garment manufacturing company, PT Fashion Stitch Joshua experiences this problem in the form of increased cycle time causes by many non value added operator motion. This study aims to design standardized motion to improve efficiency. The method used is a time and motion study through therbligh analysis to identify, classify, and eliminate ineffective movement. Data were collected through direct observation, video documentation, and cycle time measurement. The result show that the high cycle time in the join side seam process is caused by the large proportion of ineffective motion in the operators work methods. Therbligh analysis indicates that non value added motion elements significantly contribute to reduced efficiency, thereby confirming the hypothesis regarding the importance of improving work methods. Through the redesign of motion based on therbligh principles, the cycle time was reduced from 39.09 second to 29,50 second, representing an efficiency improvement of 24%. The implementation of standardized motion design is proven to be more effective in improving efficiency and can serve as a reference for production processes in the garment industry.
References
[1] I. Khadijah, A. Kusumawardhani, and J. Manajemen, “Analisis Pengukuran Kerja Untuk Mengoptimalkan Produktivitas Menggunakan Metode Time and Motion Study,” Diponegoro J. Manag., vol. 5, no. 3, pp. 1–15, 2016, [Online]. Available: http://ejournal-s1.undip.ac.id/index.php/dbr
[2] M. A’zizan, “Analisis Time and Motion Study dengan Menggunakan Metode Micromotion Study dalam Meningkatkan Produktivitas UKM Aneka Karya Glass,” vol. 1, no. 1, pp. 1–19, 2017.
[3] S. Vinodh, K. R. Arvind, and M. Somanaathan, “Application of value stream mapping in an Indian camshaft manufacturing organisation,” J. Manuf. Technol. Manag., vol. 21, no. 7, pp. 888–900, 2010, doi: 10.1108/17410381011077973.
[4] C. H. Sumerli and N. Mayselah, “Optimalisasi Produktivitas dengan Metode Time and Motion Study di PT. XYZ,” J. Res. Ind. Syst. Eng., vol. 1, no. 1, pp. 1–12, 2023.
[5] I. Fardiansyah, T. Widodo, and W. Anggraini, “Pengukuran Waktu Kerja Dengan Metode Time Motion Study Untuk Meningkatkan Produktivitas Kerja Produksi Greenware (Studi kasus : PT XYZ),” J. Ind. Manuf., vol. 7, no. 2, p. 85, 2022, doi: 10.31000/jim.v7i2.6924.
[6] Y. Mauluddin and S. A. Indriyani, “Time and Motion Study Untuk Menghilangkan Bottleneck,” J. Kalibr., vol. 23, no. 1, pp. 105–116, 2025, doi: 10.33364/kalibrasi/v.23-1.1937.
[7] Y. T. Akada and H. K. Awamura, “Time and motion study for operation improvement in Ryokans,” J. Japan Ind. Manag. Assoc., vol. 66, no. 4E, pp. 448–459, 2015.
[8] Aditya, “Penentuan Waktu Standar Proses Threading Pada Pembuatan Connector Di Pt Ge Oil Dan Gas Indonesia,” pp. 24–24, 2019.
[9] O. . A. R. Damanik, vera M. Afina, and B. A. Haulian, “Analisa Pendekatan Lean Manufacturing Dengan Metode Vsm (Value Stream Mapping) Untuk Mengurangi Pemborosan Waktu (Studi Kasus Ud. Almaida),” Profisiensi, vol. 5, no. 1, pp. 1–6, 2017.
[10] L. T. Dewi, M. H. R. S. R. Sari, C. Dewi, and V. Ariyono, “Implementasi Prinsip Ekonomi Gerakan Untuk Pengaturan Tata Letak Fasilitas Kerja Pada Pemrosesan Batu Alam,” PERFORMA Media Ilm. Tek. Ind., vol. 14, no. 2, pp. 149–156, 2015, doi: 10.20961/performa.14.2.11488.
[11] Z. Raharusun, A. Soleman, and A. L. Kakerissa, “Penetapan Studi Gerak, Penentuan Waktu Baku Dan Pengukuran Produktivitas Kerja Pada Proses Pengemasan Abon Ikan,” I Tabaos, vol. 3, no. 1, pp. 49–58, 2023, doi: 10.30598/i-tabaos.2023.3.1.49-58.
[12] M. M. Abdurrahman, R. Kastaman, and T. Pudjianto, “Rancang Ulang Tata Letak Fasilitas Produksi untuk Efisiensi Produksi Kopi di PT Sinar Mayang Lestari Menggunakan Metode Systematic Layout Planning dan Software Blocplan,” Agrikultura, vol. 32, no. 2, p. 146, 2021, doi: 10.24198/agrikultura.v32i2.33610.
[13] Yudisha, Nabila. "Perhitungan waktu baku menggunakan metode Jam Henti pada proses Bottling." Jurnal Vorteks 2.2 (2021): 85-90.
[14] R. L. Herlina, “Analisis Gerakan-Gerakan Kerja Pada Pembuatan Rumah Kunci Dengan Menggunakan Metode Motion Study,” Ensains J., vol. 2, no. 3, pp. 215–221, 2019.
[15] F. E. Meyers and J. R. Stewart, Motion and time study for lean manufacturing, 3rd ed. Upper Saddle River, N.J. SE - xvii, 370 pages : illustrations ; 24 cm: Prentice Hall, 2002. doi: LK - https://worldcat.org/title/45493275.
[16] B. Price, “Frank and Lillian Gilbreth and the Manufacture and Marketing of Motion Study , 1908-1924,” Bus. Econ. Hist., vol. 18 Second, no. c, pp. 1–12, 1989.
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Syafruddin Dwi Saefi Ismail, Anita Oktaviana Trisna Devi, Bekti Nugrahadi (Author)

This work is licensed under a Creative Commons Attribution 4.0 International License.











