Perencanaan Pit Limit Penambangan Blok D dengan Optimasi Nilai Net Present Value Pada PT Bumi Indo Power Kabupaten Tanjung Jabung Barat Provinsi Jambi

Authors

  • Yudi Arista Yulanda Universitas Jambi Author

Keywords:

Perencanaan Tambang, Stripping Ratio, Pit Limit, Optimasi, NPV, Discounted Cash Flow

Abstract

PT. Bumi Indo Power (BIP) will open a new pit in an area where there is still coal distribution in the mining business permit area, namely in block D of PT Bumi Indo Power, for this reason, planning for determining mining boundaries (pit limits) is needed based on the optimal Stripping Ratio value. The purpose of this study is to determine the most optimal Stripping Ratio value to obtain maximum profits using the discounted cash flow method, so that the optimum mining limit (Ultimate Pit Limit) can be determined. then make a pit plan and mining limits in accordance with the geometry recommendations, namely a tier height of 10 m, a tier width of 5 m, and a single slope of 45°. The optimization process is carried out by compiling data on stripping ratio variations that represent pit boundaries and reserves at each stripping ratio, then combined with economic considerations using a discount rate of 11.76% to obtain the Net Present Value (NPV) value, so that it can be analyzed through an optimization curve. The results of the study show that the optimum stripping ratio value obtained through the optimization curve with the Conventional NPV method in the Spot Price scenario is 8.8 with total reserves reaching 907,717 tons, a mine life of 4 years, and an NPV of IDR 285,254,334,789.00.

References

[1] A. Hakim, M. U. Dwiatmoko, and S. Melati, “Review Kemajuan Tambang Bulan November 2019 dan Perencanaan Tambang Bulan Desember 2019 di Tambang Terbuka Batubara,” Jurnal Geomine, vol. 8, no. 3, p. 181, 2021, doi: 10.33536/jg.v8i3.599.

[2] A. Rifandy and S. M. . Syamsidar, “Optimasi Pit Tambang Terbuka Batubara dengan Pendekatan Incremental Pit Expansion, BESR dan Profit Margin,” Jurnal Geologi Pertambbangan, vol. 2, no. 3, pp. 14–25, 2018, [Online]. Available: http://ejurnal.unikarta.ac.id/index.php/jgp/article/view/578

[3] S. Hartanti and K. M. A. Isnaeni, “Kajian Ekonomi Menggunakan Metode Discounted Cash Flow Pada Penambangan Batubara Di Pit A PT XYZ,” Juremi J. Ris. Ekon., vol. 2, no. 4, pp. 579–588, 2023, doi: 10.53625/juremi.v2i4.4700.

[4] E. N. H. Prasetyono, E. Kusdarini, and Y. D. G. Cahyono, “Rancangan PIT Penambangan Batubara Pada PIT X PT. Prolindo Cipta Nusantara, Site Sie Loban, Kabupaten Tanah Bumbu, Provinsi Kalimantan Selatan,” Pros. Semin. Teknol. Kebumian dan Kelaut., vol. 2, no. 1, pp. 71–78, 2020.

[5] S. A. Firdaus, N. Nurhakim, U. Saismana, and T. Nor, “Perencanaan Tahapan Penambangan Bulanan Pada Tambang Terbuka Batubara Metode Open Pit,” 2017. doi: 10.20527/jg.v2i1.4200.

[6] D. Saputra, M. Asof, and E. W. DH, “Rancangan Teknis Penambangan Batubara Di Blok Selatan Pt. Dizamatra Powerindo Lahat Sumatera Selatan,” pp. 0–8, 2014.

[7] H. Sidiq and I. Pusvito, “Penentuan Pit Limit Penambangan Batubara Dengan Metode Lerchs-Grossmann Menggunakan 3DMine Software,” Kurvatek, vol. 1, no. 2, pp. 67–72, 2017, doi: 10.33579/krvtk.v1i2.245.

[8] A. Muliyanto, U. Saismana, M. U. Dwiatmoko, and C. Cahyono, “Perencanaan Penambangan Batubara Pit A PT Amanah Anugerah Adi Mulia Desa Maragut Kec. Dusun Timur Kab. Barito Timur Provinsi Kalimantan Tengah,” J. GEOSAPTA, vol. 1, no. 01, p. 25, 2016, doi: 10.20527/jg.v1i01.740.

[9] M. Oktavia, M. Arofa, R. Arafat, and D. Rahmawati, “Perencanaan Desain Pit Tambang di PT. Winner Prima Sekata Kecamatan Tebo Ilir Kabupaten Tebo, Provinsi Jambi,” Jurnal Pertambangan dan Lingkungan, vol. 4, no. 1, pp. 16–23, 2023, [Online]. Available: http://journal.ummat.ac.id/index.php/JPL

[10] Y. A. Yulanda, M. T. Toha, and F. Syarkowi, “Optimasi Stripping Ratio Dengan Metode Discounted Cash Flow Pada Project PLTU Mulut Tambang,” Jurnal Pertambangan, vol. 4, no. 3, pp. 128–133, 2020, doi: 10.36706/jp.v4i3.470.

[11] R. F. Ikhwal and M. MS, “Perhitungan Sumberdaya Batubara dan Permodelan Pit 2 Pada PT. Andhika Yoga Pratama (AYP), Kecamatan Pauh, Kabupaten Sarolangun, Jambi,” Jurnal Bina Tambang, vol. 4, no. 1, pp. 297–306, 2019.

[12] S. Buana, N. Nurhakim, and R. N. Hakim, “Perhitungan Sumberdaya Batubara Menggunakan Metode Polygon Dan Metode Isoline Pada Wilayah IUP PT Usaha Baratama Jesindo,” Jurnal Himasapta, vol. 5, no. 1, pp. 5–8, 2020, doi: 10.20527/jhs.v5i1.2045.

[13] W. G. W. Kiki, I. Arifudin, and Sasongko, “Analisis-Break-Even-Stripping-Ratio,” 41th IAGI Annu. Conv. Exhib., pp. 52–55, 2012.

[14] Supandi., H. Sidiq, and B. Pangacella, Buku Ajar Perencanaan Tambang, no. 1. 2023.

[15] Ahmad Khairul, “Perancangan Tambang (Pit Design) dan Pentahapan Tambang Batubara Pit Blok 3 dengan Stripping Ratio 7 : 1 di PT XYZ, Desa Lubuk Sini, Kecamatan Taba Penanjung, Kabupaten Bengkulu Tengah, Provinsi Bengkulu,” Bandung Conf. Ser. Min. Eng., vol. 1, no. 1, pp. 1–7, 2021, doi: 10.29313/bcsme.v1i1.68.

[16] Q. Ayun, R. Juniah, and Azwardi, “Analisis kelayakan investasi penambangan batubara di PT. Cipta Kridatama site PT. KIM, Kabupaten Bungo, Provinsi Jambi,” Jurnal Teknologi Mineral dan Batubara, vol. 19, no. 1, pp. 57–72, 2023, doi: 10.30556/jtmb.vol19.no1.2023.1327.

Downloads

Published

08/10/2025

How to Cite

[1]
“Perencanaan Pit Limit Penambangan Blok D dengan Optimasi Nilai Net Present Value Pada PT Bumi Indo Power Kabupaten Tanjung Jabung Barat Provinsi Jambi”, jse, vol. 10, no. 4, Oct. 2025, Accessed: Apr. 30, 2026. [Online]. Available: https://jse.serambimekkah.id/index.php/jse/article/view/1307

Similar Articles

1-10 of 299

You may also start an advanced similarity search for this article.