Analisis Kelayakan Ekonomi terhadap Pembangunan Jalan di Perkebunan Sawit Desa Alue Siron Kabupaten Nagan Raya
Keywords:
Kelayakan ekonomi, Net present value, Benefit cost ratio, Payback periodAbstract
The main goals of the strategic plan are to improve mobility and increase the economic productivity of the local population by building a road through the oil palm plantation region of Alue Siron Village, Nagan Raya Regency. The goal of this study is to calculate the payback period and assess the project's economic viability utilizing the Net Present Value (NPV), Benefit-Cost Ratio (BCR), and Internal Rate of Return (IRR) approaches. Both primary and secondary sources of information were gathered. A poll of seventy-three people provided the primary data, and official references provided the secondary data. Discount rates of 12%, 15%, and 18% were used in the study. The investigation findings show that improving roads significantly raises community revenue and boosts the effectiveness of palm oil distribution. The payback period analysis confirmed the project's economic viability, which was 9.7 years, and the positive results of the NPV and BCR calculations at a 12% discount rate. Nevertheless, the NPV turned negative, the BCR was less than 1, and no intersection signified a payback time at 15% and 18% discount rates. The IRR is higher than the applicable interest rate of 13.761%.
References
[1] “Undang-Undang Republik Indonesia Nomor 22 Tahun 2009 Tentang Lalu Lintas Dan Angkutan Jalan.”
[2] S. Ss And D. Maryam, “Peran Pemerintah Desa Dalam Pembangunan Infrastruktur Desa (Duwet, Bojong, Kabupaten Pekalongan),” Jurnal Qistie, Vol. 16, No. 2, P. 236, Nov. 2023, Doi: 10.31942/Jqi.V16i2.9575.
[3] Muhammad Aris, Cut Nuraini, And Feby Milanie, “Directions For The Development Of Coastal Area Infrastructure In Natal Sub-District, Mandailing Natal Regency, Indonesia,” Int.J.Livable.Sp., Vol. 9, No. 1, Pp. 15–31, May 2024, Doi: 10.25105/Livas.V9i1.19651.
[4] F. Salam Ahmad, “Dampak Pembangunan Jalan Tol Trans Jawa Terhadap Pertumbuhan Ekonomi Di Jawa Tengah: Institut Pertanian Bogor,” Jekp, Vol. 11, No. 1, Pp. 1–18, Jul. 2022, Doi: 10.29244/Jekp.11.1.2022.1-18.
[5] Suweda, “Penataan Ruang Perkotaan Yang Berkelanjutan, Berdaya Saing Dan Berotonomi : Suatu Tinjauan Pustaka,” Jurnal Ilmiah Teknik Sipil, Vol. 15, No. 2, Pp. 113–122, 2021.
[6] A. S. Muntohar, “Teknik Sipil Dan Pembangunan Berkelanjutan,” Bull Civ Eng, Vol. 1, No. 1, Pp. I–Ii, Feb. 2021, Doi: 10.18196/Bce.V1i1.11149.
[7] Tamin, Perencanaan, Pemodelan, Dan Rekayasa Transportasi, Bandung, Penerbit Itb. 2018.
[8] Ahlandi, “Evaluasi Manfaat Pembangunan Jalan Paya Tumpi - Paya Ilang Kota Takengon Kabupaten Aceh Tengah,” Tesis Teknik Sipil, 2019.
[9] Ahmad Subagiyo, Study Kelayakan Teori Dan Aplikasi. Pt Elex Media Komputindo, Kelompok Gramedia Jakarta, 2007.
[10] R. Djamaluddin And E. Mawardi, “Kelayakan Finansial Fasilitas Parkir Pasar Aceh Berdasarkan Qanun Kota Banda Aceh,” Jtsteknosi, Vol. 4, No. 1, Oct. 2018, Doi: 10.35308/Jts-Utu.V4i1.584.
[11] Sugiyono, Metode Penelitian Kuantitatif Dan Kualitatif Dan R&D. Bandung: Cv. Alfabeta, 2013.
[12] Purwanto, Teknik Penyusunan Instrumen Uji Validitas Dan Reliabilitas Penelitian Ekonomi Syariah. Magelang: Staia Press, 2018.
[13] Suyatno, Analisis Faktor Penyebab Keterlambatan Penyelesaian Proyek Gedung (Aplikasi Model Regresi). Tesis Program Teknik Sipil Universitas Diponegoro, Semarang., 2020.
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Rahmat Djamaluddin (Author)

This work is licensed under a Creative Commons Attribution 4.0 International License.











