Analisis Penanganan Longsoran dengan Perkuatan Bored Pile (Studi Kasus: Ruas Jalan Tb. Lahung-Sp. Muara Laung Sta. 43+900)

Authors

  • Stephanus Alexsander Jurusan Teknik Sipil, Universitas Palangka Raya Author
  • Fatma Sarie Jurusan Teknik Sipil, Universitas Palangka Raya Author
  • Apria Brita P. Gawei Jurusan Teknik Sipil, Universitas Palangka Raya Author
  • Lydia Dwinanda Sinaga Jurusan Teknik Sipil, Universitas Palangka Raya Author

Keywords:

bored pile, finite element method (FEM), landslie, safety factor (SF), slope

Abstract

A landslide occurred on Tb. Lahung–Sp. Muara Laung Road Section Sta.43+900 experienced a slope collapse, measuring 7 m deep, along the roadside. This underscores the urgent need for effective landslide management. This study definitively sets out to determine the initial safety factor (SF) value on the landslide slope and analyze changes in safety factor (SF) value after the slope was reinforced with bored piles. Slope stability analysis was conducted using the finite element method (FEM) with Plaxis. The analysis of existing conditions yielded an initial safety factor (SF) value of 2.474. This indicates that the slope is safe; however, it is a landslide slope. The back analysis was conducted, and the SF value changed to 1,032, indicating critical slope conditions. The slope stability analysis was performed using Bishop's method to calculate the safety factor manually. The result was an SF value of 1.00, indicating that the slope is in critical condition. The slope was reinforced with bored piles that were 0.5 m diameter and 8 m long. The safety factor (SF) value increased to 1,323. The safety factor (SF) has met the requirements of SF ≥ 1.25 (SNI 8460-2017). The landslide at the study site required a total of 54 bored piles.

References

[1] Das, B.M., “Principles of Geotechnical Engineering – Seventh Edition”, Stamford, USA: CENGAGE Learning, 2010.

[2] Van Zuidam, R.A., “Aerial Photo-Interpretation Terrain Analysis and Geomorphology Mapping”, Netherlands: Smith Publisher The Hague, ITC, 1985.

[3] Suryolelono, K.B., “Bencana Alam Tanah Longsor Perspektif Ilmu Geoteknik” in Pidato Pengukuhan Jabatan Guru Besar, Yogyakarta: Fakultas Teknik Universitas Gajah Mada, 2002.

[4] Kementerian Pekerjaan Umum dan Perumahan Rakyat, Balai Besar Pelaksanaan Jalan Nasional VII Satker Perencanaan dan Pengawasan Jalan Nasional Provinsi Kalimantan Tengah, Direktorat Jenderal Bina Marga, 2017.

[5] Gouw, T.L. & Dave J.G.H., “Analisa Stabilitas Lereng Limit Equilibrium vs Finite Element Method”, HATTI Annual Scientific Meeting XVI, 4-5 Desember 2012, 4-5. Jakarta: Hotel Borobudur, 2012

[6] Hardiyatmo, H.C., Geosintetik untuk Rekayasa Jalan Raya: Perancangan dan Aplikasi, Yogyakarta: Gajah Mada University Press, 2008.

[7] Andika, E., and Hermawan, C., “Analisis Stabilitas Lereng dengan Perkuatan Tiang Bor (Bore Pile) Menggunakan Program Geoslipe”, Jurnal Perencanaan, Sains, Teknologi dan Komputer, vol. 5, no. 2, pp. 90-93, 2022.

[8] Susanti, I., S.B. Sipayung, N. Cholianawati, S.A. Rahayu, L.S.S., and R. Sunarya, “Pengaruh Curah Hujan Terhadap Potensi Longsor di Daerah Aliran Sungai (DAS) Citarum”, Jurnal Prosiding SNSAA 2012: Sains Atmosfer dan Aplikasinya, pp. 148-157, 2012.

[9] Nandi, Longsor, Bandung: Jurusan Pendidikan Geografi, Fakultas Pendidikan Ilmu Pengetahuan Sosial, Universitas Pendidikan Indonesia, 2007.

[10] Hardiyatmo, H.C., Mekanika Tanah 2 Edisi Ketiga, Yogyakarta: Gajah Mada University Press, 2003.

[11] Badan Standarisasi Nasional, SNI 8640:2017 Persyaratan Perancangan Geoteknik, Jakarta: BSN, 2017.

[12] Reddy, J. N., Solutions Manual for An Introduction to the Finite Element Method, Third Edision, New York: McGraw-Hill, 2005.

[13] Franki Foundation UK, 2021, Bored Pile Installation Procedure. [Online] Available at: https://blog.frankifoundations.co.uk/en/bored-pile-installation-procedure [Accesed 29 August 2024].

[14] Bishop, A.W., “The Use of Slip in the Stability of Analysis of Slopes”, London: Geotecnique, vol. 5, pp. 7-17, 1955.

[15] Kementrian Pekerjaan Umum, Rekayasa Penanganan Keruntuhan Lereng pada Tanah Residual dan Batuan, Jakarta: Direktorat Jenderal Bina Marga, 2005.

Downloads

Published

26/06/2025

Issue

Section

Articles

How to Cite

[1]
“Analisis Penanganan Longsoran dengan Perkuatan Bored Pile (Studi Kasus: Ruas Jalan Tb. Lahung-Sp. Muara Laung Sta. 43+900)”, jse, vol. 10, no. 3, Jun. 2025, Accessed: Jul. 18, 2025. [Online]. Available: https://jse.serambimekkah.id/index.php/jse/article/view/911

Similar Articles

1-10 of 416

You may also start an advanced similarity search for this article.